A listing price can start the budget; it is not the whole budget.
Treating the price paid to a manufacturer in China as the cost of a machine installed and ready at your plant in Türkiye can throw the investment budget well off. The sound approach is to review every stage needed to put the machine to work, not only the purchase amount.
Machine price and the scope of the offer
Establish which of the main machine, optional equipment, moulds or tooling, software, spare parts, warranty, technical training and installation are inside the price.
Delivery term and responsibilities
Terms such as EXW, FCA, FOB, CIF and DAP point to different cost and risk splits. The named place and the contract details matter as much as the term itself. Writing “FOB” alone is not enough; the port and loading conditions should be stated. Review the contract so the commercial terms are applied correctly.
International freight and insurance
Volume, weight, special-cargo needs, ports of departure and arrival, mode of transport, insurance cover and possible transhipment all change the budget.
Import taxes and customs formalities
Customs duty and any additional duty, VAT, applicable trade measures, clearance and brokerage costs are assessed from the machine’s GTIP, origin, value and the conditions of the transaction. General rates found online should not be treated as a firm tax promise for every machine.
Inland transport, installation and commissioning in Türkiye
After port or customs formalities, inland transport, crane work, positioning, electrical supply, air or cooling systems, assembly, operator training and trial production affect the investment budget.
Time, exchange rate and financing
Exchange-rate movement, the payment schedule, waiting time, the cost of finance and the chance that the machine starts production late should also be reviewed.
Incentive and financing options
An incentive certificate, eligible KOSGEB support and leasing are not automatic for every project. Application conditions, the investment subject, the nature of the company and the rules should be reviewed separately. Possible support should not be written into the budget as guaranteed income before a firm approval.
An approach that makes comparison easier
Build the same budget headings for every offer: machine and options; logistics; taxes; customs formalities; inland transport; installation; training; financing and a contingency. Two offers given on different delivery terms then become easier to compare.
Official sources
This article is for general information. Taxes, import conditions, product-safety duties and incentive programmes can change by product and current rules. For a specific transaction, rely on the competent authority and a qualified specialist.